DZ17A/0161
GrantedLands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18
Lands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18
A temporary concrete batching plant will be built on the Cherrywood development site to produce concrete for the main construction works. The facility will operate for 7 years and will then be removed.
The site will include cement silos, a batching and mixer plant, aggregate storage bins, water storage tanks, fuel storage, contractor offices and welfare facilities, truck and staff parking, a pump house, an electricity substation and backup generator, plus boundary fencing and site lighting.
The plant covers 0.95 hectares within the Cherrywood Strategic Development Zone. It is a temporary facility required to support the wider Cherrywood residential and mixed-use development.