D08A/0121
GrantedBlock C, Cherrywood Science And Technology Park, Cherrywood, Loughlinstown, Co. Dublin
Block C, Cherrywood Science And Technology Park, Cherrywood, Loughlinstown, Co. Dublin
The existing Block C Facilities Centre is being extended and modified. The ground floor will be extended northward by 52 sq.m, bringing the total building floor area to 5,974 sq.m. New shop front doors will be added to the north-facing ground floor elevation.
The extension creates additional retail space on the ground floor. Shop front access is being added to the main northern elevation of the building.
Service loading and access arrangements are being modified. Four options are proposed: a 2m loading bay with 2m footpath along the entire frontage; a partial arrangement with mixed footpath widths; use of the laneway to the west between Block C and the existing crèche; or road realignment with landscape changes. The scheme aims to balance service access with pedestrian movement.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.