DZ19A/0255
GrantedCherrywood Business Park (lands including & adjoining Bldgs 2-5 & 7 & basement level under Buildings 3, 4 & 5, Pond 4 & part of the linear park), Cherrywood, Co Dublin .
Cherrywood Business Park (lands including & adjoining Bldgs 2-5 & 7 & basement level under Buildings 3, 4 & 5, Pond 4 & part of the linear park), Cherrywood, Co Dublin .
The development adds 3 single-storey meeting pods elevated on stilts with renewable energy, a large covered canopy between the main buildings, and significant landscaping improvements including a sunken garden and upgraded park connections.
3 meeting pods (28 sq.m each, 4.3m high) positioned east of Pond 4, each with pedestrian bridges and renewable energy systems. A 320 sq.m canopy (7m high) will cover the central plaza between Buildings 2–5. Building facades will be altered.
A new sunken garden between the main buildings includes stairs and a lift. New stairways and improved pedestrian and cycling routes connect the Business Park to the linear park. Viewing areas and an upgraded public park section will enhance public access.
33 car parking spaces will be removed (9 from basement, 24 from surface level) to accommodate a new vehicle ramp and reconfigured circulation. A ramp north-east of Building 4 will become cyclist-only. New bicycle stands and shelters are planned.
Solar panels and wind turbines on the pods provide renewable energy. Sustainable drainage systems including bioretention areas and rain gardens will manage water. Ground levels will be modified east of Pond 4, and landscaping works include tree planting and new pedestrian routes.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.