DZ19A/0255
GrantedCherrywood Business Park (lands including & adjoining Bldgs 2-5 & 7 & basement level under Buildings 3, 4 & 5, Pond 4 & part of the linear park), Cherrywood, Co Dublin .
Cherrywood Business Park (lands including & adjoining Bldgs 2-5 & 7 & basement level under Buildings 3, 4 & 5, Pond 4 & part of the linear park), Cherrywood, Co Dublin .
The development adds three elevated meeting pods, a large central canopy, improved landscaping including a sunken garden, enhanced cycling routes, and new welfare facilities across the business park.
3 single-storey meeting pods (28 sq.m each, 4.3m high) elevated 3.5–5.3m above ground with solar panels and micro wind turbines. A 320 sq.m canopy (7m high) located centrally between Buildings 2, 3, 4, and 5. Building facades will be altered.
New sunken garden between Buildings 2–5 with stairs and lift access. Improved linear park with new landscaping, pedestrian and cycle routes connecting to existing paths. New stairway linking the business park to the linear park.
33 car parking spaces removed (9 at basement level, 24 at surface level) to accommodate a new vehicle access ramp north of Building 3. Existing ramp northeast of Building 4 converted for cyclists only. New bicycle stands and shelters added.
Sustainable urban drainage systems including bioretention areas and rain gardens. Landscaping grading and planting works. Modifications to ground levels east of Pond 4 to create viewing areas and access to the meeting pods.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.