DZ17A/0161
GrantedLands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18
Lands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18
A temporary concrete batching plant will be built on 0.95 hectares in Laughanstown to produce concrete and aggregates for the Cherrywood development. The facility will operate for 7 years and will then be removed.
The plant includes a batching mixer, cement silos, aggregate storage bins, conveyor systems, water and fuel storage tanks, and a pump house. There will also be contractor's offices, welfare facilities, staff and truck parking, site lighting, and open and covered storage areas.
An electricity substation and backup generator will power the site. Boundary treatments and site development works are included. The plant is temporary and designed to support construction across the wider Cherrywood Strategic Development Zone.