Skip to main content

DZ18A/0854

Granted

site (c.2.62 HA) at Cherrywood Business Park, Cherrywood Avenue, Cherrywood, Co. Dublin (also Dublin 18) (lands to the south and west of Blocks G and G2, south of Cherrywood Avenue)

Development Description

This application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended). Permission on this site. The proposed development will consist of: - the construction of an attenuation pond system (known as Pond 5A) comprising 3no. ponds (including Pond 5A-0 – sedimentary forebay and Ponds 5A-1 and 5A-2 – treatment and attenuation ponds) with associated outfall, infilling of the existing temporary attenuation pond (south of Cherrywood Avenue and west of Block G2) and regarding of the site levels to facilitate the development of the adjoining Res 2 residential plot (subject to separate planning application). The proposed works also include a pedestrian and cycle route with natural open space areas including tree planting, seating areas, hard and soft landscaping and boundary treatments with provision for a future connection of the pedestrian and cycle route to Bride’s Glen Road to the south. Permission is also sought for all associated infrastructure connections including diversion of an existing 38kV underground cable and all associated ancillary and site development works.

Application Details
Planning Reference
DZ18A/0854
Application Type
Permission (SDZ)
Status
Decision Issued
Registered
6 Sep 2018
Decision
GRANT PERMISSION
Decision Date
31 Oct 2018
Applicant
Hines Cherrywood Development Fund ICAV
Case Officer
Julieanne PrendivilleApproved Officer
Agent / Architect
BMA Planning
Decision Due
31 Oct 2018