DZ17A/0061
GrantedBuilding 4 (previously Block AD), Cherrywood Business Park, Cherrywood, Dublin 18
Building 4 (previously Block AD), Cherrywood Business Park, Cherrywood, Dublin 18
The ground floor of Building 4 will change from unused office space to a medical research laboratory. New equipment will be added at basement and roof level to support the facility.
A 1,035 sq.m medical research laboratory will occupy the ground floor of Building 4, which is currently vacant.
The building elevation will be modified with louvres and non-transparent windows on the north east and north west sides. A new air handling unit at roof level will extend 3 metres in height, rising 800mm above the existing plant screen.
A caged plant area (c.16 sq.m) at basement level will house a generator. An air handling unit will be installed at roof level within the existing plant enclosure.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.