DZ18A/1129
GrantedSite (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
The developer is building a new rainwater detention basin (pond) and drainage pipes to manage stormwater from the Cherrywood development. This includes filling in an existing temporary pond and connecting new pipes to Ticknick stream. The site will be regraded and landscaped with seating and pathways.
A detention basin will be created to hold and slowly release rainwater, reducing flood risk. The existing temporary pond north of Mercer Link Road will be filled in. Stormwater from Beckett Park will also drain through a new pipe to Ticknick stream. The site includes soft landscaping and tree planting.
New pedestrian pathways and seating areas will be provided across the site for residents and park users.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.