DZ25A/0044/WEB
GrantedIn the Townlands of Laughanstown, and Brennanstown, Dublin 18
In the Townlands of Laughanstown, and Brennanstown, Dublin 18
An additional storey is being added to two residential buildings (Building 2 and Building 3) within the existing Cherrywood development, adding 25 new homes to the scheme.
The new 25 units comprise 10 one-bed, 13 two-bed, and 2 three-bed homes. The overall development will contain 517 units. Some existing units are being redesigned, including corner balcony modifications and reconfigured layouts. All units remain build-to-rent.
Car parking is reduced from 555 to 381 spaces (268 below ground, 113 at surface level). Bicycle parking increases from 655 to 760 spaces (650 long-stay, 110 short-stay), with improved basement access via new level entry and stairs.
Public realm and amenity spaces are being reconfigured, including updated streetscapes and public lighting. An underground attenuation storage facility (for stormwater management) remains unchanged in volume.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.