DZ19A/0255
GrantedCherrywood Business Park (lands including & adjoining Bldgs 2-5 & 7 & basement level under Buildings 3, 4 & 5, Pond 4 & part of the linear park), Cherrywood, Co Dublin .
Cherrywood Business Park (lands including & adjoining Bldgs 2-5 & 7 & basement level under Buildings 3, 4 & 5, Pond 4 & part of the linear park), Cherrywood, Co Dublin .
Cherrywood Business Park will gain 3 elevated meeting pods, a large central canopy, improved landscaping including a sunken garden, new basement welfare facilities, and enhanced pedestrian and cycling connections.
Three 28 sq.m single-storey meeting pods will be elevated 3.5–5.3 metres above ground on the east side of Pond 4, with wind turbines and solar panels. A 320 sq.m canopy will be built centrally between Buildings 2–5, rising 7 metres at its highest point.
A sunken garden with stairs and a lift will be created between Buildings 2–5, with new connections to the basement and linear park. The linear park will be improved with new landscaping, pedestrian routes, and cycle paths linking to existing trails.
33 car parking spaces will be removed (9 from basement, 24 from surface level) due to a new vehicle ramp north of Building 3 and traffic layout changes. A ramp north-east of Building 4 will be converted for cyclists only. Bicycle stands and shelters will be added at surface level.
Sustainable Urban Drainage Systems including bioretention areas and rain gardens will manage surface water. Ground levels will be modified east of Pond 4 to create viewing areas. Public lighting will be upgraded and utilities (water, gas, sewage, communications) will be rerouted.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.