GrantedSite (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
A new stormwater pond (detention basin) will be built to collect and manage rainwater from future school development. An existing temporary pond will be infilled, and a new drainage pipe will connect the Beckett Park system to Ticknick stream. The site will be regraded and landscaped with seating and boundary treatments.
The detention basin will reduce flooding risk by temporarily holding stormwater before it flows to Ticknick stream. Soft landscaping will be added across the 0.95 hectare site. This work prepares the ground for a future school planning application.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.