DZ18A/1129
GrantedSite (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Construction of a drainage pond and new pipes to collect stormwater from the growing Cherrywood neighbourhood and direct it safely into Ticknick stream. An existing temporary pond will be filled in and the ground regraded to prepare for a school building in the future.
The attenuation pond (detention basin) will slow and store stormwater during heavy rain, reducing flood risk downstream. New landscape features including seating and planted areas will make the pond a usable green space. Water will be discharged to Ticknick stream via controlled outfalls.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.