DZ18A/1129
GrantedSite (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
A new detention basin (stormwater pond) to collect and manage rainwater from the site, with associated drainage pipes connecting to Ticknick stream and the existing Beckett Park system. The site will be regraded to prepare the ground for a future school, subject to separate planning permission.
The detention basin is a sustainable drainage system designed to reduce flood risk by temporarily storing rainwater before releasing it gradually to Ticknick stream. An existing temporary pond to the north will be filled in. The development includes landscaping and seating areas.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.