Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Development Description
Permission for: The construction of an attenuation pond (detention basin) with associated outfall to Ticknick stream, infilling of the existing temporary attenuation pond (north of Mercer Link Road, constructed as part of the Phase 1 Roads and Infrastructure works permitted under Reg. Ref. DZ15A/0758), construction of a new stormwater outfall pipe from Beckett Park attenuation system to Ticknick stream (granted under Ref. Ref. DZ15A/0814) and regrading of the site levels to facilitate the future development of this school plot (subject to separate future planning application). The proposed works include all associated infrastructure connections, hard and soft landscaping with seating, boundary treatments and all associated ancillary and site development works. This application includes development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014, as Amended.