DZ18A/1129
GrantedSite (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
A new rainwater detention basin and stormwater pipe to manage water drainage for the future school development at Laughanstown and Brennanstown. The existing temporary pond north of Mercer Link Road will be filled in and replaced with a permanent solution connected to Ticknick stream.
The development includes a detention basin (a shallow pond that temporarily holds rainwater during heavy storms to prevent flooding) and a new outfall pipe linking Beckett Park's drainage system to Ticknick stream. Site levels will be regraded to prepare for future school construction. Landscaping, seating areas and boundary treatments are also planned.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.