DZ22A/0403
RefusedTownlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18
Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18
This is a minor revision to an already-approved 168-unit residential development in Development Area 8 (Tully), part of the Cherrywood Strategic Development Zone. The changes involve swapping house types and adjusting roof designs on three apartment blocks.
12 houses fronting Tully Road are being redesigned to different styles that were already approved elsewhere in the scheme. 3 duplex blocks (apartment buildings) will have their shared corridor roofs changed from glazed to solid panels, which raises the parapet (roof edge) height slightly but does not change the overall building height. All 168 units remain unchanged in total.
The site covers 9.68 hectares, bounded by Castle Street to the west, Gun and Drum Hill Road to the north, and Lehaunstown Lane to the south. The development is being built in phases to manage construction and resident occupation.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.