DZ19A/0148
Granted17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
Three apartment blocks (C1, C2, and D1) on the Cherrywood town centre site are being reconfigured to add 47 new homes, bringing the total from 384 to 431 units.
The development will contain 59 studios, 109 one-bed, 231 two-bed, and 32 three-bed units. All units will have balconies or terraces. The blocks front onto Grand Parade, Bishop Street, Tully Vale Road, and Wyattville Link Road.
Retail space increases from 299 to 564 sq.m. Non-retail space (offices, services) increases to 2,047 sq.m. Resident amenities expand to 1,096 sq.m. A relocated crèche with outdoor play area is included.
431 car parking spaces and 431 bicycle spaces are provided in basement levels. 21 motorbike spaces are also included.
Landscaping is revised and a green wall is added to improve the appearance of the blocks.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.