Skip to main content

DZ20A/0877

Granted

Bishop Street, Cherrywood, Dublin 18, Co Dublin

Development Description

Permission for development at this site. The site is located on the northern side of Bishop Street, circa 20m west of the Luas line crossing. The proposed development will consist of a single storey Gas District Regulator Installation (DRI) building and associated site development works. The building has a gross floor area of 6.177 square metres and will be two metres in height. The site area is 86 square metres, This application relates to development in the Cherrywood Strategic development zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended)

Application Details
Planning Reference
DZ20A/0877
Application Type
Permission (SDZ)
Status
Decision Issued
Registered
27 Nov 2020
Decision
GRANT PERMISSION
Decision Date
29 Jan 2021
Applicant
Hines Cherrywood Development Fund ICAV
Case Officer
Enda DuignanDirector of Planning
Agent / Architect
John Spain Associates
Ward
Cabinteely-Loughlinstown
Decision Due
29 Jan 2021