DZ16A/0597
GrantedLands (c.1.87 ha) in the townland of Laughanstown, Dublin 18
Lands (c.1.87 ha) in the townland of Laughanstown, Dublin 18
A gas infrastructure facility with 2 structures (regulator and boiler kiosk), underground pipelines, floodlights, and a new 601-metre access route connecting from Lehaunstown Lane/M50 overbridge to the main site.
The regulator skid is 48.75 sq.m with a maximum height of 3.2 metres; the boiler/instrumentation kiosk is 48.1 sq.m with a maximum height of 3.9 metres. Security fencing will be 2.4 metres high, with 2 floodlights at 9 metres each.
A new 601-metre access route will be built from the existing M50 overbridge at Lehaunstown Lane. Of this, 345 metres lies outside the Cherrywood planning boundary.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.