DZ19A/1024
Granted17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
The development modifies the approved basement design under three residential blocks (A1, A2, A3) in the Cherrywood town centre, reducing overall basement size and reorganising car parking and cycling facilities.
The amendment affects three residential blocks fronting Bishop Street, Grand Parade and Cherrywood Avenue. No change to the number of residential units; the modification concerns underground parking and access arrangements.
The reconfigured basement will provide 331 residential car parking spaces (including 7 accessible spaces), 415 bicycle spaces, and 11 motorcycle spaces. An additional 62 residential spaces are reassigned from commercial use in an adjacent basement. Pedestrian access to parking is provided from all three blocks.
Basement floor area reduces from 139,400 sq.m to 137,400 sq.m — a 2,000 sq.m decrease. Excavation is reduced at eastern and western ends beneath the podium level.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.