DZ19A/0148
Granted17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
The development reconfigures Blocks C1 and C2 at the Cherrywood town centre (plot TC2) to add 47 new apartments to the previously approved scheme, increasing residential units from 384 to 431 across the site.
The 431 units comprise 59 studios, 109 one-bedroom, 231 two-bedroom, and 32 three-bedroom apartments. All units have balconies or terraces. The development spans multiple blocks fronting Grand Parade, Bishop Street, Tully Vale Road, and Wyattville Link Road.
Ground floor and basement space increases retail to 564 sq.m, non-retail (offices, services) to 2,047 sq.m, and resident amenities to 1,096 sq.m. A relocated crèche with outdoor play space is included.
431 car parking spaces are reconfigured within basements, along with 431 bicycle spaces, 21 motorbike spaces, and associated storage for residents.
Total site area is 17.01 hectares. Residential floor area increases to 35,787 sq.m, with overall plot floor area rising to 47,395 sq.m.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.