DZ21A/1038
Grantedsite 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18
site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18
A new post-primary school building for 1,000 pupils, including a dedicated 4-classroom unit for students with special educational needs, a PE hall, and all associated school facilities.
The building is three storeys on part of the site and two storeys on the remainder, covering a total of 11,536 sq.m across the 1.85-hectare site.
6 external ball courts for PE and sports activities, plus a dedicated PE hall within the main building.
Vehicle access from Castle Street with staff car parking, delivery and emergency vehicle access, plus dedicated pedestrian and bicycle access with bicycle parking facilities.
181 sq.m of solar panels on the roof for renewable energy. Landscaping, boundary treatments, and connections to public water, wastewater, and electricity services including a new ESB sub-station.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.