DZ19A/0148
Granted17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
Blocks C1, C2 and D1 on plot TC2 are being redesigned to add 47 new apartments, with reconfigured parking, retail, and amenity spaces across the town centre development.
The development will contain 431 units: 59 studios, 109 one-beds, 231 two-beds, and 32 three-beds. All units include balconies or terraces. Residential floor area increases from 35,290 to 35,787 sq.m.
Retail space increases to 564 sq.m. Non-retail space (including a relocated crèche with outdoor play area) reaches 2,047 sq.m. Resident amenities expand to 1,096 sq.m.
431 car parking spaces are provided in reconfigured basements. 431 bicycle spaces and 21 motorbike spaces are included. The blocks front onto Grand Parade, Bishop Street, Tully Vale Road and Wyattville Link Road.
Revised landscaping includes green wall provision. Plant equipment is relocated to roof and basement levels. All associated site development works are included to support the reconfiguration.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.