Site approx. 6.57ha in area and generally bounded by, Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south, and Cabinteely Stream, (partly) to the east that is, located within the townland of, Brennanstown, Dublin 18
Development Description
Permission sought for a residential development at a site measuring approximately 6.57ha. The development will consist of the construction of 367 no. new residential dwellings, comprising 190 no. apartments arranged in 4 blocks, ranging in height between 4- to 5-storeys in height (comprising 15 x 1 bed units and 175 x 2 bed units): 24 no. duplex units (comprising 12 x 2 bed units and 12 x 3 bed units); 60 no. triplex units (comprising 40 x 2 bed units and 20 x 3 bed units) and 93 no. 4 bedroom houses (comprising a mix of detached, semi-detached, and terraced house types) together with a Childcare Facility with a floorspace of 233 sqm (GFA) and ancillary open space. The proposed development includes for all associated infrastructural works to include the part delivery of the Cherrywood SDZ Planning Scheme`s Druid`s Glen Distributor Road (also known as Q to P3), measuring approximately 390m in length to include the construction/completion of the part approved 3-span bridge (Option 1) over the Cabinteely Stream under Planning Ref. DZ16A/0587 (ABP Ref. PL06D.247915) immediately adjoining the application site to the east. The development will also include the construction of: ancillary waste storage facilities; ancillary waste recycling collection area; associated car parking (total of 607 no. car parking spaces, comprising 218 spaces at basement level and 389 surface level spaces (including 6 no. ancillary car parking spaces in connection with the childcare facility)); bicycle parking spaces (total of 300 no. cycle parking spaces, comprising 202 basement level spaces and 98 surface level spaces); a number of ancillary public open spaces; provision of boundary treatments; lighting; associated hard and soft landscaping (including changes in site levels and playground provision); associated infrastructural and site development works above and below ground (including 2 no. permanent water attenuation ponds and 1 no. temporary attenuation pond).