DZ21A/1038
Grantedsite 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18
site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18
A new post-primary school for 1,000 pupils is being built on an 1.85-hectare site at Castle Street and Bishop Street, Cherrywood.
The school spans three storeys at its highest point (reducing to two storeys in parts). It includes classrooms, a PE hall, a 4-classroom special educational needs unit, teacher facilities, and a library.
Six external ball courts serve students. Solar panels (181 sq.m) will be installed on the roof to generate renewable energy.
Vehicle access is via Castle Street, with staff car parking, delivery and emergency access. Pedestrian and bicycle routes are included, along with bicycle parking spaces.
The site includes landscaping, boundary treatments, and connections to public water and waste services. An ESB sub-station provides power.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.