DZ19A/0148
Granted17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
The development reconfigures two residential blocks (C1 and C2) on a town centre plot to add 47 new apartments, increasing the total from 384 to 431 units. The site fronts onto Grand Parade, Bishop Street, Tully Vale Road and Wyattville Link Road in Cherrywood SDZ.
The 431 units comprise 59 studios, 109 one-bed, 231 two-bed, and 32 three-bed apartments. All units will have balconies or terraces. Gross residential floor area increases from 35,290 sq.m to 35,787 sq.m.
Ground floor and basement space reconfigured to provide 564 sq.m retail, 2,047 sq.m non-retail (offices, services), and 1,096 sq.m resident amenities. A crèche with outdoor play area is relocated and slightly enlarged.
431 car parking spaces are reconfigured within existing basements without exceeding the permitted total. 431 bicycle spaces, 21 motorbike spaces, and storage are provided.
Revised landscaping treatment includes provision of a green wall. Associated site development works and revised plant arrangements at roof and basement levels support the reconfiguration.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.