DZ21A/1038
Grantedsite 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18
site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18
A new post-primary school for 1,000 pupils, including a dedicated Special Educational Needs unit with 4 classrooms, PE hall, and all associated teaching and support facilities.
The school will be up to 3 storeys high in parts, stepping down to 2 storeys elsewhere across the 1.85-hectare site.
6 external ball courts and a dedicated PE hall will serve pupils. Landscaping and boundary treatments will integrate the school into the surrounding area.
Vehicular access from Castle Street with staff car parking, delivery and emergency vehicle access. Separate pedestrian and bicycle access points, plus bicycle parking facilities.
181 sq.m of photovoltaic solar panels on the roof to generate renewable energy. Full connection to mains water, wastewater, and electricity services.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.