DZ19A/0148
Granted17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
Reconfiguration of three residential blocks (C1, C2, D1) within the existing Cherrywood town centre to add 47 new homes, increasing total units from 384 to 431.
The 431 units comprise 59 studios, 109 one-beds, 231 two-beds, and 32 three-beds. All units include balconies or terraces. The blocks front onto Grand Parade, Bishop Street, Tully Vale Road and Wyattville Link Road.
Expanded ground-floor retail and non-retail spaces, increasing retail from 299 to 564 sq.m and non-retail (offices, services) from 1,997 to 2,047 sq.m. Relocated crèche with expanded outdoor play area. New residential amenity areas increase from 878 to 1,096 sq.m.
431 car parking spaces (basement), 431 bicycle spaces, and 21 motorbike spaces. Parking does not exceed the previously permitted total of 2,792 spaces for the wider development.
Revised landscaping throughout the site, including new green walls. Electrical substations relocated and one additional substation added to support increased residential density.