DZ19A/1024
Granted17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
This is a modification to an existing approved town centre development. The proposal reduces and reconfigures the basement areas under three residential blocks (A1, A2, A3) to optimise parking and storage layouts, and reassigns some commercial parking spaces to residential use in a separate building.
The development affects three residential blocks (A1, A2, A3) that front onto Bishop Street, Grand Parade and Cherrywood Avenue. The basement underneath will be reduced in size from 139,400 to 137,400 sq.m, with revised courtyards and landscaping.
The reconfigured basement will provide 331 residential car spaces (including 7 accessible spaces), 11 motorcycle spaces, and 415 bicycle spaces. An additional 62 residential spaces are reassigned from commercial use in the adjoining TC2 building. Pedestrian access to the basement is via the three residential blocks.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.