DZ19A/0148
Granted17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
The developer is reconfiguring three blocks in the town centre to add 47 more apartments, increasing the total from 384 to 431 units. The layout of ground floors, basements, and roofs is being reorganised to fit the extra homes and improve parking, retail, and community spaces.
The 431 apartments comprise 59 studios, 109 one-bed, 231 two-bed, and 32 three-bed units across Blocks C1, C2, and D1. All units will have balconies or terraces. The total residential floor area increases from 35,290 to 35,787 square metres.
Retail space increases to 564 square metres. Non-retail space (including offices and services) rises to 2,047 square metres. Resident amenity areas increase to 1,096 square metres. A crèche with outdoor play space is included and relocated within the development.
431 car parking spaces are provided in reconfigured basements, along with 431 bicycle spaces and 21 motorbike spaces. Four electrical substations will supply the site. The development fronts onto Grand Parade, Bishop Street, Tully Vale Road, and Wyattville Link Road.
Landscaping is revised across the site, including new green wall installations. All associated site development and environmental works are designed to support the expanded development.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.