DZ19A/1024
Granted17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
This is a redesign of the underground car parking and basement layout for three existing residential blocks (A1, A2, A3) in Cherrywood town centre. The basement will be slightly smaller and reorganised to work more efficiently.
The development affects three existing residential blocks (A1, A2, A3). The basement reconfiguration will provide 331 car parking spaces for residents, including 7 accessible spaces and 11 motorcycle spaces. 415 bicycle spaces will also be provided.
In the separate commercial block (TC2), 102 car parking spaces will be reassigned: 62 will convert to residential parking and 34 will remain for commercial use.
The basement floor area will decrease from approximately 139,400 sq.m to 137,400 sq.m, reducing excavation at the eastern and western ends of the site.
The development provides 331 residential car parking spaces and 415 bicycle spaces in the basement. Pedestrian access to the basement will be available from all three residential blocks. Parking is accessed via Bishop Street, Grand Parade, Cherrywood Avenue, and Tullyvale Road.
Revised landscaping will be provided in the courtyards of Blocks A1, A2, and A3 as part of the redesign.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.