DZ19A/0148
Granted17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
The site will add 47 new apartments to three existing residential blocks (C1, C2, and D1) in the Cherrywood town centre, increasing total homes from 384 to 431. The development spans 17.01 hectares across four townlands and includes shops, offices, a crèche, and parking.
The 431 units comprise 59 studios, 109 one-bed, 231 two-bed, and 32 three-bed apartments spread across three blocks. All units will have balconies or terraces. The total residential floor area increases from 35,290 to 35,787 square metres.
Retail space grows to 564 square metres. Non-retail uses (offices, services) increase to 2,047 square metres. A crèche with an outdoor play area and 1,096 square metres of resident amenity space (gyms, lounges, meeting rooms) are included.
431 car parking spaces are provided in basements, along with 431 bicycle spaces and 21 motorbike spaces. The site fronts four roads: Grand Parade, Bishop Street, Tully Vale Road, and Wyattville Link Road.
Landscaping has been revised with new green walls. Four electrical substations service the development (three relocated, one new). Plant and utilities are arranged at roof and basement levels to minimise visual impact.