DZ25A/0044/WEB
GrantedIn the Townlands of Laughanstown, and Brennanstown, Dublin 18
In the Townlands of Laughanstown, and Brennanstown, Dublin 18
The developer is modifying an existing permission to add an extra storey to two apartment buildings within Cherrywood, creating 25 additional homes and bringing the total scheme to 517 units.
The new 25 units comprise 10 one-bedroom, 13 two-bedroom, and 2 three-bedroom homes. The scheme also includes design changes to 54 existing units, including corner balcony modifications and minor reconfiguration to apartment layouts across Buildings 2 and 3.
Car parking will reduce from 555 to 381 spaces (268 below ground, 113 at surface level). Bicycle parking increases from 655 to 760 spaces (650 long-stay, 110 short-stay), with improved access routes including new stairs with guide rails.
The development includes reconfigured public realm and amenity spaces, with improvements to streetscapes and public lighting throughout the site.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.