DZ20A/0585
Refusedon a site in the Townlands of Laughanstown and Cherrywood, Dublin 18
on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18
A temporary marketing suite will be built for 4 years and 11 months within the Cherrywood Village Centre. The development is part of the larger Cherrywood Strategic Development Zone.
The marketing suite comprises 3 buildings arranged around a landscaped courtyard: 2 single-storey buildings and 1 two-storey building with a total floor area of 304 sq.m. A marketing sign will be displayed on the main entrance.
The development includes a new vehicular access from Gun and Drum Hill Road serving 8 car parking spaces. Access to the site is also provided via existing permitted roads at Castle Street, Bishop Street, and Cherrywood Avenue, linking to Valley Drive and Wyatville Link Road.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.