DZ19A/1021
RefusedBlocks F1, F2 and F3 (3no. office blocks under construction) at Cherrywood Business Park, Cherrywood, Co Dublin (also Dublin 18)
Blocks F1, F2 and F3 (3no. office blocks under construction) at Cherrywood Business Park, Cherrywood, Co Dublin (also Dublin 18)
The developer is seeking permission to use 229 basement car parking spaces at Blocks F1, F2 and F3 for temporary parking for 7 years. This will support construction activities across Cherrywood and replace existing temporary surface car parking.
The proposal converts basement parking at levels −1 and −2 into temporary spaces to serve construction traffic and logistics in the area. After the 7-year period, these spaces will revert to their original use as permanent basement parking for the office buildings.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.