The development includes a new detention basin (a pond that temporarily holds rainwater during heavy rainfall) with an outfall to Ticknick stream, plus a new stormwater pipe from Beckett Park to the same stream. An existing temporary pond north of Mercer Link Road will be filled in and the site levelled to prepare for a future school.
The detention basin is a sustainable drainage system (SuDS) designed to reduce flooding by storing rainwater and releasing it slowly into Ticknick stream. The site will include landscaping, seating areas and boundary treatments to integrate the pond into the local landscape.