DZ20A/0585
Refusedon a site in the Townlands of Laughanstown and Cherrywood, Dublin 18
on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18
A temporary marketing suite to promote Cherrywood village centre development, comprising 3 buildings arranged around a landscaped courtyard within the Cherrywood Strategic Development Zone.
The development covers 0.4 hectares and includes 2 single-storey buildings and 1 two-storey building with a total floor area of 304 sq.m. A 3.5–3.7 metre high boundary wall and covered walkway enclose the courtyard.
New vehicular access from Gun and Drum Hill Road serves 8 car parking spaces. The site connects to existing roads at Castle Street, Bishop Street, and Cherrywood Avenue, linking to Valley Drive and the Wyatville Link Road.
The marketing suite includes office space and a directional sign (1.27 sq.m) on the southern elevation to promote the village centre development.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.