DZ23A/0811
RefusedIn the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18
A new residential apartment development of 200 units in 3 blocks, 4–5 storeys tall, on a 0.89 hectare site bounded by Bishop Street, Cherrywood Avenue, the M50, and the Wyattvile Link Road.
Block A1: 68 units (12 one-bed, 41 two-bed, 15 three-bed). Block A2: 54 units (14 one-bed, 39 two-bed, 1 three-bed). Block A3: 78 units (14 one-bed, 49 two-bed, 15 three-bed). All are apartments; no tenure mix specified.
241 car parking spaces (139 lower ground, 102 basement; 10 accessible, 48 for electric vehicles). 264 bicycle spaces (220 long-stay, 44 short-stay) plus 10 motorcycle spaces. Vehicle access via Cherrywood Avenue.
1,645 sq.m courtyard gardens, including 1,456 sq.m private shared amenity space. Hard and soft landscaping, tree planting, and boundary treatment included. Minor Phase 1 revisions: civic park landscaping updates, foul water outfall relocation, and attenuation tank repositioning.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.