DZ21A/1038
Grantedsite 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18
site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18
A new post-primary school for 1,000 pupils, rising three storeys in places and two storeys elsewhere, with specialist facilities for students with additional needs.
The school includes a PE hall, a 4-classroom special educational needs unit, and all standard teaching spaces, staff offices, and student facilities across a 11,536 sq.m building.
Six external ball courts provide outdoor sports facilities. Pedestrian and bicycle access will be provided from Castle Street for students and staff.
Staff car parking, bicycle parking, and separate delivery and emergency vehicle access from Castle Street. Pedestrian and cycle routes integrated into the site design.
181 sq.m of solar panels on the roof. Site landscaping and boundary treatments to integrate the school into its surroundings.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.