DZ18A/1129
GrantedSite (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
The development involves building a new water retention pond (detention basin) and stormwater pipes to manage surface water runoff from the Cherrywood area and channel it safely to Ticknick stream.
A new attenuation pond will be constructed to hold stormwater during heavy rainfall, protecting the area from flooding. The existing temporary pond north of Mercer Link Road will be filled in. A new stormwater pipe will connect Beckett Park's drainage system to Ticknick stream. The site will be regraded and landscaped with seating areas.
The site covers 0.95 hectares across Development Areas 1 and 8 in Cherrywood.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.