DZ24A/1024/WEB
GrantedIn the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18
In the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18
This is an amendment to an already-approved development in Cherrywood (Blocks B1–B3, bounded by Bishop Street, Cherrywood Avenue, the M50, and HIE5). No new homes or commercial space are being added — the change adjusts parking, cycling facilities, and underground infrastructure.
Car parking is being reduced from 312 to 213 spaces (78 at ground level, 135 underground). Bicycle parking increases to 391 spaces (82 short-stay, 309 long-stay). A new long-stay cycle store (39 sq.m) is being added in the courtyard.
The underground level (podium) beneath Blocks B1–B3 is being reconfigured and reduced. A new combined substation, switch room, and refuse store building (60 sq.m) is being added. Surface water attenuation tanks along Civic Park are being modified.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.