DZ24A/1007/WEB
Granted‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
The temporary surface car park (Red Zone) will be significantly reduced from around 740 spaces to 398 spaces, with the remaining area freed up for future residential development. The layout, access and drainage will be reconfigured to support new homes planned nearby. Additionally, 226 parking spaces in The Campus basement will be made available for temporary use over the next 5 years while other development is underway.
The reconfigured temporary car park will include dedicated areas for bus drop-off and motorcycle parking alongside the 398 car spaces. Access arrangements and surface water drainage have been redesigned to work with the neighbouring residential development.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.