DZ23A/0811
RefusedIn the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18
A new residential development of 200 apartments in 3 blocks, ranging from 4–5 storeys, on a 0.89-hectare site bounded by Bishop Street, Cherrywood Avenue, the M50, and the Wyattvile Link Road.
Block A1: 68 units (12 one-bed, 41 two-bed, 15 three-bed). Block A2: 54 units (14 one-bed, 39 two-bed, 1 three-bed). Block A3: 78 units (14 one-bed, 49 two-bed, 15 three-bed). All apartments are build-to-rent.
Access via Cherrywood Avenue. 241 car parking spaces (10 accessible, 48 electric vehicle charging). 264 bicycle spaces (220 long-stay, 44 short-stay) and 10 motorcycle spaces. 5 car-share spaces relocated from Phase 1.
1,645 sq.m of courtyard gardens, including 1,456 sq.m of shared amenity space for residents. Hard and soft landscaping throughout.
Total gross floor area approximately 27,308 sq.m. Buildings range from 4–5 storeys across the 3 blocks.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.