DZ17A/0731
GrantedG3 (west of Block G2), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin (within the Cherrywood Strategic Development Zone (SDZ) and subject to the Cherrywood Planning Scheme 2014)
G3 (west of Block G2), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin (within the Cherrywood Strategic Development Zone (SDZ) and subject to the Cherrywood Planning Scheme 2014)
A 4-storey office building with 2,851 sq.m of workspace, plus parking, cycling facilities, and landscaping on a 0.34 hectare site in Cherrywood Business Park.
The building provides 615 sq.m of office space on the ground floor and approximately 745 sq.m on each of the three upper floors. The undercroft includes a waste collection area, bicycle storage, and a substation.
There are 28 car parking spaces (including 3 disabled spaces and 3 EV charging points) accessed via the rear. 30 bicycle spaces are provided: 15 long-stay spaces in a covered undercroft store and 15 short-stay spaces near the entrance. A drop-off area is at the front. The site will be served by a permanent access road that also acts as an emergency route to Building 11.
The building is 4 storeys tall with a maximum height of 19.38 metres (including roof plant). The total site area is 0.34 hectares with a gross floor area of 2,851 sq.m.
The scheme includes hard and soft landscaping, drainage and attenuation works, retaining walls, and lighting. A buffer area is reserved along the western and southern boundary to accommodate the proposed Luas tram extension.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.