DZ25A/0044/WEB
GrantedIn the Townlands of Laughanstown, and Brennanstown, Dublin 18
In the Townlands of Laughanstown, and Brennanstown, Dublin 18
An additional storey is being added to two existing residential buildings (Building 2 and Building 3) within the approved Cherrywood development, creating 25 new apartments and increasing the total scheme from 492 to 517 units.
The 25 new units comprise 10 one-bed, 13 two-bed, and 2 three-bed apartments. An additional 54 existing units are being modified—mostly corner balcony redesigns, with some reconfigured to single aspect and three converted from 2-bed to 1-bed.
Car parking reduces from 555 to 381 spaces (268 basement, 113 surface level). Bicycle parking increases from 655 to 760 spaces (650 long-stay, 110 short-stay), with improved basement access via additional level entrances and stairs with guide rails.
External public realm and amenity spaces are being reconfigured, including updates to streetscapes and public lighting throughout the development area.
A below-ground water storage facility remains in place with no change to overall storage volume. Ventilation systems are being revised to accommodate the new storey.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.