DZ20A/0585
Refusedon a site in the Townlands of Laughanstown and Cherrywood, Dublin 18
on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18
A temporary marketing suite for the Cherrywood Village Centre, comprising 3 small buildings (two 1-storey and one 2-storey) arranged around a landscaped courtyard within Development Area 8 – Tully. The development is permitted for 4 years and 11 months only.
The marketing suite has a total floor area of 304 sq.m and will display information about the broader Cherrywood development. A marketing sign (approximately 1.3 sq.m) will be affixed to the entrance.
The site will have 8 car parking spaces accessed via a new entrance from Gun and Drum Hill Road. Visitors can also reach the marketing suite via existing roads: Castle Street, Bishop Street, and Cherrywood Avenue, connecting to Valley Drive and the Wyatville Link Road.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.