DZ20A/0585
Refusedon a site in the Townlands of Laughanstown and Cherrywood, Dublin 18
on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18
A temporary marketing suite for the Cherrywood village centre, lasting 4 years and 11 months. The building will showcase the wider development to potential residents and businesses.
3 buildings (two 1-storey, one 2-storey) arranged around a landscaped courtyard, enclosed by the buildings or a covered walkway up to 3.7 metres high. Total floor area is 304 sq.m.
New vehicular access from Gun and Drum Hill Road. 8 car parking spaces on site. The development will use existing roads (Gun and Drum Hill Road, Castle Street, Bishop Street, and Cherrywood Avenue) to connect to Valley Drive and the Wyatville Link Road.
Marketing suite with 304 sq.m of floor space. A marketing sign (1.27 sq.m) will be displayed on the southern entrance.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.