DZ24A/1030/WEB
GrantedIn the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
An amendment to an earlier permission that adds 59 new apartments to an existing four-block residential development in Cherrywood, with changes to building heights, parking, and cycling facilities.
The development will contain 158 units in total: 3 studios, 20 one-bed units, and 135 two-bed units. Four blocks (A, B, C, D) will range from 4 to 5 storeys high. All units are owner-occupier apartments.
133 car parking spaces (129 basement, 4 at surface level) replace the previously permitted 155 spaces. Bicycle parking increases to 267 spaces (220 long-stay, 45 short-stay, 2 cargo spaces). The site connects to the Luas green line and is bounded by Grand Parade, Tully Vale Road, and Bishop's Street.
Landscaping improvements include redesigned courtyards, increased open space, new planting, and refined SuDS (sustainable drainage) design. Surface water and foul drainage systems are reconfigured to suit the revised basement layout.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.