DZ18A/1129
GrantedSite (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Construction of a new rainwater detention basin (pond) connected to Ticknick stream, plus a new drainage pipe from Beckett Park to the stream. An existing temporary pond north of Mercer Link Road will be filled in. The site will be regraded to prepare for a future school building, which will need separate planning approval.
The attenuation pond will manage stormwater runoff from the development and surrounding areas, reducing flood risk. Landscaping, seating, and boundary treatments will improve the site. Water will eventually discharge to Ticknick stream.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.