DZ24A/1024/WEB
GrantedIn the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18
In the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18
This is a modification to a development already approved in 2022 and 2024. The changes reduce car parking, increase bicycle storage, add a utility building, and reconfigure underground parking areas. No residential units are being added or removed.
Car parking is being cut from 312 to 213 spaces: 78 at street level and 135 below ground. Bicycle storage is growing to 391 spaces total, with a new 39 sq.m long-stay bike store added in the courtyard.
A new 60 sq.m utility building will house a substation, switch room and refuse store. Surface water drainage tanks along Civic Park are being modified to fit the updated layout.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.